Oct. 31st, 2008

myurbandream: (sanzo's happiness)
so, on thursday our studio professor had a "family meeting" with us, and gave out assignments for both this coming monday (f***) and final review at the end of the year (just kill me now). and they are as follows:

due Monday, Nov 3:
1/4" sliced-section/elevation drawings, 3-lineweight limit
1/16" plan drawings, all issues resolved
1/8" section drawings, all issues resolved
1/8" elevation drawing- spatial/material
3D diagrams of program/skin and concept/detail linked
perspective diagram (if the old one is unchanged it will do)
AND
1/8" complete model, all issues resolved
1/4" or 1/2" sliced-section model

due for Final Review, Dec 4: all at final quality
1/8" model (4 days)
1/2" or 1/4" all-basswood section model, no detailing (5 days)
AND
1/8" section and elevation drawings (12 hrs)
1:50 or 1:100 urban plan diagram, with project represented (1 hr)
1/16" plan drawings (6 hrs)
at least two hand-constructed perspective drawings, rendered in photoshop (1 day)
2-4 diagrams of structure/mechanical and envelope/skin (36 hrs total)
BONUS: any other rendered, axonometric, or 3D drawings

time lengths in parentheses are for the amount of time truitt expects each of these things to take us to do at final quality. we stop design and begin work on these on Nov 17. note that thanksgiving break is after that, and that my other classes (and my job) continue until... dec 5, i think.

we are so f***ed.

i need chocolate.

Profile

myurbandream: (Default)
myurbandream

April 2025

S M T W T F S
  12 345
6789101112
13141516171819
20212223242526
27282930   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 15th, 2025 07:34 pm
Powered by Dreamwidth Studios